Case History - Maccaferri Turkey

 Case History

January 23, 2019
Çöpler Altın Madeni İstinat Duvarları Projesi

Çöpler Gold Mine Retaining Walls

Çöpler Gold Mine located in the province of Erzincan, needed a 20m high retaining wall for the grinder area to be formed on a terrace on the slope of a hill. It was also necessary to construct a retaining structure for the crusher wall having a height of 14m which would allow the ore to be dumped into the crusher brought by trucks from the open pit mine.
December 12, 2018

Awash Kombolcha Hara Gebaya Railway Project

Awash-Kombolcha-Hara Gebaya Railway Project. ETHIOPIA, AFRICA. PROTECT THE BRIDGE PIERS AGAINST SCOURING. Product: Box Gabion, Reno Mattress
May 30, 2018
terramesh sistem ile sedde imalat maccaferri

Kozcağız Dam Project

In scope of the Kozcagiz Dam project an additional construction of berms was required and the construction of this geosynthetic-supported berm is still ongoing.
March 5, 2018
zemin güçlendirme uyg

Kayapark Project Basel Reinforcement

The Turkish Housing Authority wanted to convert an abandoned mining site into a 300,000 m2 housing complex comprising residential housing and park area with pedestrian walkways.
November 24, 2017
Sel Felaketini Engelleyen Çelik Moloz Bariyeri

Debris Flow Application Rize Turkey

Turkey experiences most of its avalanches and debris flows in the northeast part of Anatolia, a region replete with mountains, valleys and rivers. These events of nature interrupt transportation and communication lines, let alone their potentially deadly impact on life and loss of property.
For more information

You can get in touch by calling +90 216 217 53 70



Follow us on Social Media!

Subscribe to new updates!

We will let you know about the latest news!


I want to sign up